Came home tonight and was pissed because the contractors used the wrong color grout. I thought that was the wrost of my problems but figured I could live with it. Then I tripped over a tile. Then I started to look around. Almost everywhere, except around the toilet was uneven.
As if the uneven, tile with random thickness grout and barrier corner parts wasn't bad enought, the shower pan even went downhill away from the drain which is bound to be a water nightmare in the future. It is so visually obviously that it makes me feel like I am in a crooked fun house looking at it.
Lets start out with the good side. Notice the evenness of the tile height. On this side the bottom tiles are all the same height.
Then on the other side it goes downhill on one side, like the pan concrete goes downhill, away from the drain in the front left corner. You can tell when you look at how much larger the bottom rows of white tiles go down on the left side of the picture. That side is almost a half inch lower. That is going to be a nightmare if its not fixed as the water will pool in that corner.
Before they began work I spent weeks tearing out an uneven 6" tile floor so that the new floor could be even. There was nothing left but the joists of the house. They put in a new seamingly even as plywood is floor as underlayment. The tile floor is really even around the toilet. Like this.
But then everywhere else it is this. We are talking like $3k worth of marble thats part of a $25k bathroom remodel that is potentially fucked up. I was so hoping this would be over but now I feel we are just beginning.
My other bathrooms 100 year old stone tile floor that is perfectly flat. I know from tearing up the other one that they used thick mud.
Paul's Journal
My Podcast Link
10/17/2013 22:55 #58156
Nightmare Tile ScenarioCategory: bathroom
10/17/2013 21:05 #58155
Frontyard - Cycles at Burchfield PenneyCategory: art
Wednesday (e:holly) and I attended the soft opening of the Frontyard show. The projector towers are amazing. I am excited to be a part of it. Here is to a smooth Friday opening.
metalpeter - 10/17/13 23:10
looks great.... I just wonder if they will really work in heavy rain and snow ....like they are supposed to very cool idea.....
looks great.... I just wonder if they will really work in heavy rain and snow ....like they are supposed to very cool idea.....
10/17/2013 21:00 #58154
Squeaky Wheel Member ShowCategory: art
We attended the Squeaky Wheel member show where (e:terry) was elected to be a board member on his way to becoming the treasurer.
10/14/2013 23:58 #58146
Working On CyclesCategory: art
I have been working a bunch on the cycles project coming to the Burchfield Penney. RPCI donated the old intranet server to the project. Here you can see it in its new home which is not really the environment it was used to. At one point someone was sweeping up the dust in the room.
The server is used to process weather data and create playlists for the server.
metalpeter - 10/16/13 18:14
cool and congrats ....
cool and congrats ....
They worked on it today, I am curious to see tomorrow.
Do you think they would take it all out and re-lay it? It does look pretty uneven :s
That is insane... Your contractor fucked up and they should have planned it out better or stopped when the tile was not laying flat. I hope you get it fixed because that's a lot of money to not have it perfect.
I would almost think that with those tiles the problem could have started with uneven mortar that was put down over the plywood. Get it the way you want it now or you will hate it every time you walk in the bathroom.